Start a conversation

Division

Tekton Pole & Pipe

Compare a new molded utility asset with rehabilitation of a pole or pipe already in service.

Current company offering

Utility pole and industrial pipe
Company studio illustration · Theis Industries ↗

Application

A utility may be replacing deteriorated assets or extending the service of an existing network. These paths have different access, installation and inspection requirements.

Qualification

Identify the utility’s design standard, exposure, loads and inspection regime. Keep any published figures tied to the specific pole, pipe or wrap in the underlying report.

What separates a new pole project from a rehabilitation project?

A new asset starts with its design conditions and acceptance tests. Rehabilitation begins with the existing asset’s condition, its remaining service requirements and site access.

Source record