Division
Theis Septic
Compare tank replacement with rehabilitation of an existing tank, vault or service cover.
Current company offering

Application
Sanitation operators can scope new molded equipment or improvements to an existing asset. Site loading, waste stream, ground conditions and access affect the choice.
Qualification
Document jurisdiction, contents, loading, access and inspection requirements. A storage or sanitation component has a different evidence package from a water-treatment process.
Is a tank inquiry the same as a treatment-system inquiry?
Tank selection concerns containment, installation and service. A treatment pilot also needs influent data, a treatment objective, sampling methods and agreed result thresholds.