Division
Theis Energy
Plan tank, pit and industrial asset rehabilitation around exposure, surface condition and downtime.
Current company offering

Application
A facility can scope an existing containment area or a new molded component. The contents, operating temperature, inspection needs and available shutdown window shape the inquiry.
Qualification
Request service-specific compatibility data, substrate preparation requirements, acceptance tests and inspection guidance for the proposed product.
Which facts help scope a lining project?
Name the asset, the substances it encounters, the surface condition and the period it can be taken out of service. Existing inspection photographs can help the team frame a first review.