Historical project

Wind Power Energy

A wind-system project described prototype and bench work alongside plans for redesign and independent testing.

June 2016 portfolio

Historical record

The 2016 portfolio distinguished the work already attempted from the proposed next stage. Forecasts in that document belonged to its planning assumptions.

Evidence to request

Request engineering drawings approved for release, operating conditions, instrument records and independent performance data before reporting output or efficiency.

What would a contemporary wind pilot measure?

Agree the operating conditions, baseline, instrumentation, duration and maintenance observations before collecting data. Report measured output separately from forecasts.

Source record

Parresia project portfolio, June 2016, PDF pp. 52–56. The original portfolio is held for project review.